Improvement and up-gradation Ot newly declared National Highways NH-227B.

Post By Jobs & Business Finder.™

BOQ Summary Details Tender Titte: Improvement and up-gradation Ot newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-lV, Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in thc state ot Uttar Pradesh On Engineering. Procurement and Construction (EPC) basis.

Key Points:

  1. Project Name: Improvement and Upgradation of NH-227B (84 Kosi Parikrama Marg)
  2. Package: IV
  3. Design Km: From 73+300 (Bikapur) to 140+960 (Patranga)
  4. State: Uttar Pradesh
  5. Basis: Engineering, Procurement, and Construction (EPC)

Project Overview:

  • Scope of Work: The project involves the enhancement and modernization of a segment of NH-227B, specifically from Bikapur to Patranga.
  • Objective: To improve road infrastructure, ensuring better connectivity, safety, and travel efficiency.
  • Methodology: Execution on an EPC basis means the contractor will be responsible for the design, procurement of materials, and construction of the highway.

Benefits:

  1. Enhanced Connectivity: Improved road conditions will enhance connectivity between towns and cities, facilitating smoother travel and transport.
  2. Economic Growth: Better infrastructure can lead to increased economic activities in the region, boosting local economies.
  3. Safety: Upgraded highways are expected to reduce accidents and improve overall road safety.
  4. Travel Efficiency: Reduced travel time due to improved road conditions, leading to better fuel efficiency and lower transportation costs.

Technical Aspects:

  • Engineering: Detailed design and planning to meet modern road standards.
  • Procurement: Sourcing high-quality materials and resources for construction.
  • Construction: Implementation of the designed plans, ensuring adherence to timelines and quality standards.

Project Management:

  • Stakeholders: Government authorities, local communities, contractors, and suppliers.
  • Timeline: Specific project timelines, including start and completion dates, milestones, and progress reviews.
  • Budget: Detailed budgeting and financial planning to ensure cost-effective execution.

Challenges and Solutions:

  • Land Acquisition: Addressing potential issues with land acquisition by engaging with local communities and ensuring fair compensation.
  • Environmental Impact: Implementing measures to minimize environmental impact and comply with environmental regulations.
  • Quality Control: Ensuring rigorous quality control throughout the project to maintain high construction standards.

Conclusion:

The improvement and upgradation of NH-227B (84 Kosi Parikrama Marg) from Bikapur to Patranga under the EPC model is a significant infrastructure project aimed at enhancing road connectivity, safety, and economic growth in Uttar Pradesh. The successful completion of this project will serve as a model for future highway improvements in the region